Planning3 min read

When to schedule each home project in Massachusetts

New England weather decides when outside work can happen. Inside work can happen any month. Plan the two together and you get the start dates you want.

A bathroom in Allston taken down to the studs, reframed and insulated

The short version

  • Interior remodels can run all year. Winter is a good time to start one.
  • Exterior painting and deck work need the right weather, so they are scheduled for the warmer months.
  • Book exterior projects in late winter to get the start dates you want.
  • Long lead items, like cabinets, tile and decking, set your real start date.

Winter: inside work

Kitchens, bathrooms, basements, interior painting and trim work do not care about the weather. Winter is a good time to do them: you are home more, it is easier to plan, and you will have the room ready for spring. Basements are a natural winter project because you see how the space behaves in the cold.

Winter is also the time to plan spring and summer. Get estimates for decks and exterior painting now.

Late winter and early spring: book the outside work

Deck and exterior season fills up early around Boston. Getting an estimate in late winter gives you the best shot at the start date you want. It also gives time for permits and for ordering decking and railings. Early spring is also when you see how your basement handles snowmelt and rain, useful information before finishing it.

Spring through fall: decks and exterior paint

Exterior paint needs the right temperatures and dry weather to cure. Every product lists its minimum temperature on the label, and surfaces have to be dry. That is why we schedule outside painting for the months it will cure properly, and work around rain.

Decks are built from spring through fall. Footings need ground that is not frozen, and the work goes faster in good weather.

A new deck framed off the house in Westford during the warmer months
A new deck framed off the house in Westford during the warmer months. See this project

Fall: finish outside, start inside

Early fall is good painting weather in New England, but the window closes as nights get cold. It is also the time to finish any exterior repairs before winter: rotted trim, a loose railing, gaps around windows. Late fall is a good time to start planning a winter kitchen or bathroom so materials arrive on time.

A sample year

Here is how a homeowner planning several projects might lay out the year. Your own order depends on the house and the budget.

WhenGood time to
January – FebruaryKitchen, bathroom or basement remodel. Get estimates for spring deck and exterior work.
March – AprilFinish interior work. Order decking and choose exterior colors. Watch how the basement handles snowmelt.
May – JuneStart decks and exterior painting as the weather warms.
July – AugustExterior painting and decks continue. Plan fall interior projects.
September – OctoberLast exterior painting and repairs before the cold. Choose cabinets and tile for a winter remodel.
November – DecemberStart interior work. Trim, doors and interior painting before the holidays.

Combining projects can also save time: a bathroom and the hallway outside it, or a basement and the stairs down to it, share setup, protection and finishing.

Lead times set the real start date

The calendar is only half the story. Cabinets, stone, custom glass, specific tile and some decking products can take weeks to arrive. Choosing them early is what turns a planned start date into an actual one.

  • Kitchens: cabinets, countertop material and appliances.
  • Bathrooms: tile, vanity, fixtures and glass.
  • Decks: decking and railing system.
  • Painting: colors, so samples can be tested in your light.
Cowboy

Cowboy General Service Inc. remodels, builds and paints for homeowners in Boston and the towns within about 50 miles of Malden, since 2006. Questions about your own house? Call or text (617) 869-2290.

Common questions

Still wondering about something? Call or text (617) 869-2290 and ask us directly.

Can you paint the outside of a house in the fall?

Yes, early fall is often good painting weather. It depends on temperatures and dry days, so we schedule around them.

Is winter a bad time to remodel a kitchen?

No. Interior work runs all year, and winter is a good time to start so the kitchen is done before the busy season.

How far ahead should I book a deck?

Late winter or early spring gives you the most choice of start dates for spring and summer.

Tell us what you want to change.

Free, itemized estimates in writing for homes in Boston and the towns around it. Most people start with a call or a few photos by text.

We call you back to set up a visit. Have photos of the space? Text them to (617) 869-2290.

Call Free estimate