The short version
- Homes built before 1978 may have lead paint, often under several newer coats.
- The risk comes from dust and chips created by scraping, sanding and demolition.
- Federal rules require lead-safe work practices when renovation disturbs paint in pre-1978 homes.
- Ask any contractor how they will handle it on your house before work starts.
Why older homes are different
Lead-based paint was banned for residential use in 1978. Much of the housing around Boston is older than that, so many homes still have lead paint on trim, windows, doors, porches and siding, usually under layers of newer paint. As long as it is intact and covered, it is not usually a hazard. The risk is the dust and chips that come from scraping, sanding, cutting or demolishing painted surfaces. Lead dust is especially harmful to young children and pregnant women.
What the rules say, in plain terms
Under the EPA's Renovation, Repair and Painting rule, work that disturbs painted surfaces in homes built before 1978 has to be done by certified firms using lead-safe work practices, unless the paint has been tested and found to be lead-free. Massachusetts also has its own lead law, with additional requirements when children under six live in the home.
You do not need to know the details. You do need to know it applies to your house, and to ask how the contractor will handle it.
What lead-safe work looks like
- The work area is sealed off with plastic sheeting, and floors are covered.
- Outside, the ground is covered to catch chips.
- Dry sanding and open-flame paint removal are avoided; methods that keep dust down are used instead.
- Debris is bagged and removed carefully.
- The area is cleaned with HEPA vacuums and wet wiping, then checked before the space is used again.
It takes more time and more care than ordinary prep. That is normal, and it should be part of the estimate, not a surprise later.
Testing
If you are not sure whether your paint contains lead, it can be tested. Test kits and professional inspections are both options. If the paint tests lead-free, the lead-safe requirements do not apply to that work.

Good painting starts with prep anyway
Paint is only as good as what is underneath it. Whether or not lead is involved, a lasting paint job comes from the hours before the paint: scraping loose paint, patching, filling nail holes, caulking joints, priming bare wood, and protecting floors and furniture. That is where we spend our time on every house.
Getting your home ready for painting
Whatever the age of the house, a little preparation helps the work go faster and keeps your things safe:
- Take down art, mirrors and curtains in the rooms being painted.
- Move fragile or valuable items yourself; we move and cover furniture as part of the job.
- Pick your colors early, and test samples on the actual walls to see them in your light.
- For exterior work, trim back plants and bushes that touch the siding.
- Tell us about pets and children, and anything about the house we should know.
Cowboy General Service Inc. remodels, builds and paints for homeowners in Boston and the towns within about 50 miles of Malden, since 2006. Questions about your own house? Call or text (617) 869-2290.



